Planning, scheduling and monitoring
Projects do not slip on site. They slip on the schedule, weeks before anyone notices on the ground. A programme that is monitored properly turns delay from an argument into a fact.
The baseline programme
Everything downstream depends on the baseline being right. We build the work breakdown structure, sequence the activities, assign durations from realistic productivity rates rather than optimistic ones, and establish the critical path.
A programme that was never achievable is worse than no programme at all: it destroys the reference point you need to prove delay later. We test the baseline against resources, procurement lead times and approval durations before it is issued.
Monitoring and variance
- Periodic progress measurement against baseline
- Critical path and float consumption tracking
- Schedule variance and cost variance reporting
- Look-ahead programmes for site coordination
- Early warning on activities trending toward delay
- Recovery and acceleration programmes
Delay analysis and extension of time
When a project runs late, the question is never simply whether it is late — it is who caused which part of the delay, and whether that delay affected the critical path. Extension of time claims succeed or fail on that analysis.
We prepare and assess EOT claims using the contemporaneous records: the baseline, the updated programmes, site instructions, approval dates and correspondence. The same method works whether we are supporting a client's rejection of a contractor's claim or building the claim itself.
Government project scheduling
We have scheduling and monitoring experience on works routed through KIIFB, HITES, WAPCOS and KSITIL. The reporting formats, approval chains and audit requirements on these projects are specific, and a programme that ignores them will not survive review.
Common questions
Questions we are asked about this.
What software do you use for scheduling?
Primavera P6 and Microsoft Project, depending on what the client or the contract requires. Government projects and larger contracts usually specify P6.
Our project is already delayed. Can you help?
Yes. We start with a forensic review — reconstructing what the programme should have been against what actually happened — then produce either a recovery programme or the delay analysis needed to establish responsibility, depending on what the situation calls for.
What is an extension of time claim?
A contractual mechanism allowing the completion date to move when delay is caused by events the contractor is not responsible for. Granting it protects the contractor from liquidated damages; assessing it properly protects the client from paying for delay that was not their fault.